Charging point installation for industrial facilities and warehouses
We design and manage charging infrastructure integrated with the electrical installation and real operations of each industrial site. We analyse power, consumption, vehicles, electrical routes and expected growth to add charging without compromising the activity.
Charging infrastructure adapted to the operations of each industrial setting
The solution changes depending on the activity, the electrical installation, the vehicles and usage times. We design each project based on the site's real conditions.
We integrate charging taking into account plant consumption, shifts, vehicles and production processes, so it is not treated as an isolated electrical load.
We study panels, electrical routes, parking and available capacity to deliver an orderly infrastructure that is ready to grow.
We coordinate charging with vehicle arrivals, departures, parking times and availability.
We design solutions for sites with different companies, zones, users or infrastructure usage models.
We size the infrastructure based on the site's power, demand and operations
Before defining chargers, we analyse how the installation works electrically, what demand charging must cover and how it should be integrated into the site.
Electrical capacity and demand curve
We analyse available power, usual consumption and the installation's behaviour to determine how much capacity can be allocated to charging without compromising the activity.
Actual capacity available for chargingCharging demand and simultaneity
We study vehicles, usage, energy needed, schedules and overlapping charging sessions to calculate the project's actual demand.
Power and number of points sizedElectrical infrastructure and implementation
We review panels, protections, distances, conduits, parking areas and internal routes before defining the installation's architecture.
Technical implementation adapted to the siteExpected growth
We build future needs into the design to make it easier to add new vehicles, chargers or charging areas.
Infrastructure ready to evolveHow we deliver a charging point project for industrial facilities
Engineering, execution and certification coordinated with industrial activity. We coordinate the project with maintenance, engineering, operations or technical management to integrate the work into a facility that is already running.
Technical survey of the site
We review needs, the electrical installation, consumption, charging areas, access and execution constraints.
Real project conditions definedEngineering and project design
We define the electrical architecture, power, protections, conduits, chargers, energy management and required technical documentation.
Properly sized technical solutionCoordinated execution
We plan access, schedules, work areas and tasks with the technical managers to reduce interference with the activity.
Implementation integrated with operationsVerification and certification
We carry out checks, certificates and documentation and coordinate the paperwork needed to get the infrastructure ready for commissioning.
Installation verified and documentedTechnical survey of the site
We review needs, the electrical installation, consumption, charging areas, access and execution constraints.
Real project conditions definedEngineering and project design
We define the electrical architecture, power, protections, conduits, chargers, energy management and required technical documentation.
Properly sized technical solutionCoordinated execution
We plan access, schedules, work areas and tasks with the technical managers to reduce interference with the activity.
Implementation integrated with operationsVerification and certification
We carry out checks, certificates and documentation and coordinate the paperwork needed to get the infrastructure ready for commissioning.
Installation verified and documentedWe prepare infrastructure that is ready to grow and be replicated across different sites
The cost of installing charging points in an industrial building or facility depends on the existing infrastructure, power, electrical work and project scope. Sizing correctly allows you to invest in phases and prepare for growth.
Initial infrastructure sized for real demand.
01 Investment Investment based on real need
We define the first phase based on current demand to avoid oversizing equipment and infrastructure.
02 Phases Phased implementation
The project can be organised by zones, buildings, vehicles or electrification stages.
03 Scalability Infrastructure growth
Panels, conduits and electrical capacity can be planned with future expansion in mind.
04 Multi-site Multi-site roll-out
We can define common technical criteria for several facilities and then adapt the project to the electrical and operational conditions of each location.
Manage charging without compromising the facility's electricity demand
The infrastructure can coordinate power, chargers, users and consumption to integrate with the site's energy operations.
Dynamic load management
We distribute the available capacity among the connected vehicles and adapt charging to the site's consumption to avoid unnecessary peaks.
Infrastructure monitoring
Centralise charger status, sessions, consumption and activity for greater visibility of how the installation is working.
User and consumption management
Define users, access and usage criteria and, where the model requires it, add cost allocation or billing for charging sessions.
Connected operation
The platform enables remote monitoring and provides useful information for maintenance, operations and facility managers.
Why trust Activacar to install charging points at your industrial facility?
Engineering and sizing
We analyse available power, demand, electrical infrastructure and expected growth before defining the solution.
Full certification
We coordinate the technical documentation, certificates, inspections and paperwork required for commissioning.
Dynamic load management
We distribute the available capacity among the vehicles and adapt charging to the facility's actual consumption.
Management and billing platform
Centralise chargers, users, sessions and consumption, adding cost allocation or billing when the operating model requires it.
Maintenance and SLA
Preventive and corrective maintenance and technical support, with service levels adapted to the needs of the facility.
Multi-site coordination and roll-out
We define common technical criteria and then adapt each project to the electrical and operational conditions of each site.
Proven experience
Experience in real projects allows us to integrate electrical, operational, execution and maintenance criteria from the outset.
Maintenance and support for industrial charging infrastructure
Operational continuity backed by real experience. Activacar offers a dedicated Maintenance of Electric Chargers to inspect, diagnose and keep charging installations running, adapting to the needs of each industrial setting.
Preventive maintenance
We regularly inspect chargers, connections, protections and installation components to detect faults before they affect operation.
Corrective maintenance
We diagnose incidents and coordinate the work needed to restore the infrastructure's availability.
Technical support
We assist the responsible teams with questions about operation, configuration and management.
SLA by project
Service terms can be defined according to the facility's criticality, scope and operational needs.
McArthurGlen Designer Outlet Málaga
End-to-end project with 32 Wallbox Pulsar Pro chargers, EVcharge integration, centralised management and load balancing, carried out while coordinating the work with the centre's activity.
Advance Andalusia
Installation of four V2C Trydan chargers at the Málaga offices for employees' electric vehicles, including planning, installation, set-up and commissioning.
See projectPreventive maintenance
Regular inspections to detect faults before they affect the service.
Corrective maintenance
Diagnosis and coordination to restore availability.
Technical support
Assistance with operation, configuration and management.
SLA by project
Service level defined according to criticality, scope and operations.
McArthurGlen Designer Outlet Málaga
Infrastructure of 32 Wallbox Pulsar Pro chargers with EVcharge, centralised management and load balancing.
See caseV2C Trydan at the Málaga offices for employee vehicles.
Frequently asked questions about charging points for industrial facilities
It depends on the number of vehicles that need charging, how they use the facility and expected growth. It is not always necessary to install all the points from the start: we can prepare the infrastructure so it can be expanded when demand increases.
The power needed depends on the number of vehicles, the energy they need to recover, the time available for charging and the electrical power that can be allocated to charging. That is why each project is sized according to the facility's actual operations.
Not necessarily. First we analyse the available power and the usual consumption of the activity to determine how much capacity can be used for charging. Other power options are only considered if the installation requires it.
The project can be designed to coordinate charging with the site's electricity demand. We analyse the activity's consumption and plan the load management needed so the chargers do not compete unnecessarily with other loads in the facility.
Load management systems can be used to distribute the available capacity among the different chargers. This way simultaneous charging sessions are coordinated and the power allocated to the infrastructure is used more effectively.
It depends on the type of vehicle, daily mileage, usage schedules and how long the vehicle stays parked. The power and type of charger must be defined according to the real needs of the fleet or the facility's users.
Yes. The infrastructure can be sized from the start with future expansion in mind, leaving panels, conduits and other elements ready to make it easier to add new charging points later.
The cost depends on the number and power of the chargers, the existing electrical capacity, the distances to the charging areas, the conduits and building work required and the management systems the project needs. That is why each installation needs to be assessed before a quote is defined.

Power, layout, operations and growth are assessed together before defining the solution.
Frequently asked questions about charging points for industrial facilities
It depends on the number of vehicles that need charging, how they are used and expected growth. It is not always necessary to install all the points from the start: the infrastructure can be prepared so it can be expanded when demand increases.
It depends on the type of vehicle, daily mileage, usage schedules and how long it stays parked. The power and type of charger must be defined according to actual usage needs.
Yes. Panels, conduits and other elements can be sized from the start to make it easier to add new charging points later.
The power needed depends on the number of vehicles, the energy they need to recover, the time available for charging and the electrical capacity that can be allocated to charging. Each project must be sized according to its actual operations.
Not necessarily. First we analyse the available power and the usual consumption of the activity to determine how much capacity can be allocated to charging. Other power options are only considered when necessary.
Yes. The project can coordinate charging with the site's electricity demand through proper management of the available power, reducing competition with other loads in the facility.
Management systems can distribute the available capacity among the different chargers to coordinate simultaneous charging sessions and make better use of the power allocated to the infrastructure.
The cost depends on the number and power of the chargers, the existing electrical capacity, the distances to the charging areas, the conduits, the building work required and the management systems. That is why each installation needs to be assessed before a quote is defined.
Our partners and the companies that place their trust in us
Request a survey to install charging points at your industrial building or facility
Tell us about your facilities and the charging needs you want to cover. We will analyse the available power, the existing electrical infrastructure, the number of chargers planned and the site's usage conditions.
With this information we can propose a solution tailored to your activity, whether you need to install your first charging points or want infrastructure ready for future expansion.
Leave your details in the form and our team will review the project to help you define the most suitable charging solution for your industrial building or facility.
We will analyse the available power, the existing infrastructure and expected growth to define a solution tailored to your activity.
Leave your details and we will review your project.



