Charging point installation for hotels


We design, install and manage charging infrastructure adapted to each hotel's operations. We analyse expected demand, electrical capacity, guest usage and future needs before defining the solution.

What does your hotel need to install electric car chargers?

Not every hotel needs the same charging infrastructure. Before deciding how many chargers to install, what power to use or where to place them, we analyse the characteristics of the property and how its guests will use charging.

Number of spaces and expected demand

We analyse how many spaces the car park has and how many electric vehicles may need charging now and in the coming years.

Electrical power available at the hotel

We review the power available at the property and its usual consumption to determine how much capacity can be allocated to charging electric vehicles.

Average length of stay of vehicles

A hotel where vehicles stay overnight does not need the same solution as one with much shorter stays.

Location and layout of the chargers

We study where the parking spaces are, the distances to the electrical panels and the layout of the car park to design an efficient installation ready for future expansion.

Managing several vehicles at once

When several guests charge at the same time, the infrastructure must distribute the available energy correctly to avoid consumption peaks and make better use of the hotel's power.

Guest identification and use

We define how guests will access the chargers: open use, user identification, activation via an app or systems that allow each charging session to be controlled.

How much does it cost to install charging points in a hotel?

Cost and investment

The investment depends on how the infrastructure is sized

There is no standard price for hotel infrastructure. The investment depends on the number of points, the power, the existing electrical infrastructure, the building work required and the management features the property needs.

The quote is based on the project's actual technical scope, not on a generic price per charger.
Request a survey for my hotel
Sizing

Number of chargers and power

The number of spaces to be covered and the power assigned to each point directly affect how the installation is sized.

Infrastructure

Electrical infrastructure and building work

Cable distances, panels, conduits, protections and any building work can significantly change the scope of the project.

Energy

Energy management

When there are several chargers, it may be necessary to add systems to control the available power and distribute it between vehicles.

Operation

Software, users and billing

Managing access, consumption, sessions or payments adds different features compared with an installation intended only to offer free charging.

Cost and investment

The quote is defined by the project, not by a price per charger

Power, building work, number of points and management features determine the actual investment.

Request a survey for my hotel
Investment variables 4 factors
Sizing
Number of chargers and power

Spaces and power per point determine the sizing.

Infrastructure
Electrical infrastructure and building work

Cabling, panels, conduits and building work change the scope.

Energy
Energy management

Power can be shared when several vehicles are charging.

Operation
Software, users and billing

Access, consumption, sessions and payments add features.

The quote is based on the project's actual technical scope, not on a generic price per charger.

Turnkey charging point project for hotels

We take care of the whole process, from the initial analysis of the hotel to commissioning and ongoing support. Each project is designed around the car park, the available power and the way the chargers will be used.

Phase 01

Technical design of the infrastructure

Sizing, power definition, charger locations, protections, conduits and criteria for growth.

Phase 02

Installation and site coordination

We build the infrastructure and coordinate the necessary work with site management, maintenance or the property's technical teams.

Phase 03

Full certification

We prepare and coordinate the technical documentation, certificates and paperwork required to commission the installation.

Phase 04

Commissioning

We configure the infrastructure, carry out the relevant checks and leave the system ready for operation.

We take care of the whole process, from the initial analysis of the hotel to commissioning and ongoing support.

Turnkey project
01 / 04
Engineering
Technical design of the infrastructure

Sizing, power definition, charger locations, protections, conduits and criteria for growth.

Properly sized infrastructure
Execution
Installation and site coordination

We build the infrastructure and coordinate the necessary work with site management, maintenance or the property's technical teams.

Work coordinated with the hotel
Legalisation
Full certification

We prepare and coordinate the technical documentation, certificates and paperwork required to commission the installation.

Installation ready for commissioning
Operation
Commissioning

We configure the infrastructure, carry out the relevant checks and leave the system ready for operation.

System ready to operate

What are the benefits of installing EV chargers at your hotel?

Adding charging points allows the hotel to improve the service it offers today and prepare its infrastructure for demand that will keep growing. The benefit is not just having chargers, but integrating them properly into the guest experience and the property's operations.

Improve the experience of guests travelling by electric vehicle

Guests can arrive at the hotel, leave their vehicle charging during their stay and continue their journey without having to look for charging infrastructure elsewhere.

Turn charging into a manageable service

The hotel can decide who uses the chargers and offer different service models: charging included, access for certain users or pay-per-use.

Grow while making better use of the available power

Proper sizing and dynamic load management allow charging to be matched to the property's electrical capacity and prepare the infrastructure for future expansion.

Integrate charging into the hotel's daily operations

Management, monitoring and maintenance can be handled within a single operating model, coordinated with the property's technical and maintenance managers.

Enable a model that can be replicated across several properties

For hotel groups, the infrastructure can follow common criteria for management, power, operation and maintenance, with each project then adapted to the characteristics of each hotel.

What it brings to the hotel 5 benefits
Improve the experience of EV-driving guests

They can charge during their stay and continue their journey without looking for charging outside the hotel.

Turn charging into a manageable service

Define users, access and service models, including pay-per-use.

Grow while making better use of the available power

Load management allows charging to be matched to electrical capacity and expanded later.

Integrate charging into the hotel's operations

Management, monitoring and maintenance can be coordinated with the property's technical managers.

Enable a model that can be replicated across several properties

A hotel group can apply common criteria for management, power, operation and maintenance across different sites.

A better experience today. Infrastructure ready to grow tomorrow.

Charging projects for one or several hotels

We can handle both the infrastructure for a single property and projects involving several hotels. The aim is to keep common technical and operational criteria without losing sight of each site's specific needs.

Multi-site roll-out One strategy · different properties

Multi-site roll-outs with the same technical strategy

For hotel groups, we can structure different sites under common criteria for sizing, technology, management and maintenance, then adapt each installation to the electrical and operational characteristics of each property.

Common project criteria
Sizing Technology Management Mantainance
Technical coordination Integrated with the hotel's teams

Coordination with site management and maintenance teams

We work alongside the professionals involved in the project to coordinate the electrical infrastructure, execution, commissioning and maintenance, so the charging installation does not operate as a project isolated from the rest of the property.

We work with One project · several stakeholders
Site management Facility management Mantainance Engineering firms Procurement Operations
Scalability and coordination 2 capabilities
Multi-site roll-out
Multi-site roll-outs with the same technical strategy

For hotel groups, we can structure different sites under common criteria for sizing, technology, management and maintenance, then adapt each installation to the electrical and operational characteristics of each property.

Common project criteria
Sizing Technology Management Mantainance
Technical coordination
Coordination with site management and maintenance teams

We work alongside the professionals involved in the project to coordinate the electrical infrastructure, execution, commissioning and maintenance, so the charging installation does not operate as a project isolated from the rest of the property.

We work with Several stakeholders
Site management Facility management Mantainance Engineering firms Procurement Operations

A common strategy, adapted to the technical and operational reality of each property.

Why trust Activacar to install charging points at your hotel?

A hotel project is not just about installing chargers. The infrastructure must be designed, integrated, managed and maintained in line with the property's actual operations.

01 Engineering

Engineering and sizing

We analyse demand, available power, car park layout and expected growth before defining the infrastructure.

A project tailored to the hotel
02 End-to-end project

Full certification

We coordinate the technical documentation, certificates and paperwork required to commission the installation.

Centralised technical management
03 Energy

Dynamic load management

We distribute the available power among the connected vehicles to match charging to the hotel's electrical capacity.

Efficient use of power
04 Operation

Management and billing platform

Control of chargers, users, sessions, consumption and billing options from a centralised management environment.

Infrastructure control
05 Continuity

Maintenance and SLA

Preventive and corrective maintenance and technical support, with service terms adapted to the project's needs.

Operational continuity
06 Scalability

Multi-site coordination and roll-out

We coordinate technical teams and can apply common project criteria across different properties.

One or several hotels
07 Experience

Proven experience

Experience in real projects allows us to propose solutions with technical, operational and maintenance criteria from the outset.

Real projects

Maintenance and support for your hotel's chargers

The project does not end with commissioning. We offer maintenance of electric chargers and support solutions to ensure the infrastructure's operational continuity and reduce the impact of any incidents.

Prevention

Preventive maintenance

Planned inspections aimed at anticipating incidents and keeping the infrastructure in proper operating condition.

Planned inspections
Incidents

Corrective maintenance

Response to faults or incidents to help restore the service and limit its impact on the property and its users.

Incident response
Assistance

Technical support

Technical support to analyse incidents, answer operational questions and support the installed infrastructure.

Technical support
Service level

Service level agreements (SLAs)

Support and service terms are defined according to the criticality and needs of each project.

Terms by project

The specific response times and terms of each SLA are set according to the project's needs.

Maintenance and support 4 areas
Prevention
Preventive maintenance

Planned inspections aimed at anticipating incidents and keeping the infrastructure in proper operating condition.

Planned inspections
Incidents
Corrective maintenance

Response to faults or incidents to help restore the service and limit its impact on the property and its users.

Incident response
Assistance
Technical support

Technical support to analyse incidents, answer operational questions and support the installed infrastructure.

Technical support
Service level
Service level agreements (SLAs)

Support and service terms are defined according to the criticality and needs of each project.

Terms by project

The specific response times and terms of each SLA are set according to the project's needs.

Activacar's experience in charging projects for hotels and businesses

Experience in hotel settings

Charging project for Macdonald Hotels & Resorts

Development of a charging solution at a hotel property, designed according to the site's technical and operational characteristics.

Proven experience

Experience with hotels and businesses that have already adopted electric mobility

Activacar has taken part in charging infrastructure projects for hotels, businesses and other corporate settings, adapting each installation to the technical and operational characteristics of each site.

See completed projects
Real projects 2 featured cases
Hotel experience
Charging project for Anantara Villa Padierna

Charging infrastructure project developed in a hotel setting, adapted to the property's characteristics and its users' mobility needs.

Hotel experience
Charging project for Macdonald Hotels & Resorts

Development of a charging solution at a hotel property, designed according to the site's technical and operational characteristics.

Proven experience
Experience with hotels and businesses that have already adopted electric mobility

Activacar has taken part in charging infrastructure projects for hotels, businesses and other corporate settings, adapting each installation to the technical and operational characteristics of each site.

See completed projects

 We install hotel charging points in these cities

Frequently asked questions about charging points for hotels

It depends on the number of spaces, current demand, the intended use of the car park and how charging needs may evolve. It is not always necessary to install all the points from the start: the infrastructure can be sized to cover current demand and be ready for future expansion.

Not necessarily. Before considering a power increase, we analyse the property's consumption, the available electrical capacity and the charging needs. This study determines whether the installation can run on the existing power or whether some adaptation is needed.

The infrastructure can include dynamic load management to distribute the available energy among the connected vehicles. This way, power is shared between the different charging points according to the electrical capacity available at any given time.

Yes. Charging can be offered as an included service for certain guests or set up through a management platform that records sessions and consumption and applies a billing model. The solution is defined according to each hotel's operations and service model.

Connected chargers and management platforms allow you to set up different access systems, identify users and record charging sessions. The level of control can be adapted to the hotel's needs and the type of service it wants to offer.

Yes. As part of the project, we coordinate the technical documentation, certificates and paperwork required to commission the installation, in line with the characteristics and requirements applicable to each project.

This can include preventive maintenance through planned inspections, corrective maintenance for faults or incidents and technical support for running the infrastructure. Where the project requires it, service level agreements adapted to its needs can also be defined.

Yes. The infrastructure can be planned from the outset with possible future expansion in mind. Proper sizing allows certain elements of the installation to be prepared for adding new chargers as demand grows, without having to rethink the whole project from scratch.

Professional installation of electric vehicle charging points at a hotel
Charging infrastructure tailored to each hotel

Sizing, load management, user control, certification and maintenance within a single project.

Your questions answered 8 questions

Frequently asked questions about charging points for hotels

Answer

It depends on the number of spaces, current demand, the intended use of the car park and how charging needs may evolve. It is not always necessary to install all the points from the start: the infrastructure can be sized to cover current demand and be ready for future expansion.

Answer

Not necessarily. Before considering a power increase, we analyse the property's consumption, the available electrical capacity and the charging needs. This determines whether the existing power can be used or whether some adaptation is needed.

Answer

Yes. The infrastructure can be planned from the outset with future expansion in mind, preparing certain elements to add new chargers as demand grows without rethinking the whole project from scratch.

Answer

The infrastructure can include dynamic load management to distribute the available energy among the connected vehicles, matching charging to the electrical capacity available at any given time.

Answer

Yes. Charging can be offered as an included service or managed through a platform that records sessions and consumption and applies a billing model according to the hotel's operations.

Answer

Connected chargers and management platforms allow you to set up access systems, identify users and record sessions. The level of control can be adapted to the service each hotel wants to offer.

Answer

Yes. As part of the project, we coordinate the technical documentation, certificates and paperwork required to commission the installation, in line with the characteristics and requirements applicable to each project.

Answer

This can include preventive maintenance through planned inspections, corrective maintenance for faults or incidents and technical support. Where the project requires it, service level agreements adapted to its needs can also be defined.

Our partners and the companies that place their trust in us

Request a survey to install charging points at your hotel with Activacar

Tell us about your hotel and the charging needs you want to cover. We will analyse the number of spaces, the available power, the intended use of the chargers and the room for future growth of the installation.

With this information we can propose a solution tailored to your property, whether you want to start with a few charging points or need infrastructure ready to grow.

Leave your details in the form and our team will review your project to help you define the best option for your hotel.

Tell us what your hotel needs. We will analyse the available power, intended use and growth potential to propose a tailored solution.
Leave your details and we will review your project.