EV charging point installation for electric vehicle fleets


We design, install and manage charging infrastructure adapted to each fleet's real operations: vehicles, daily mileage, shifts, charging windows, available power and expected growth.

We size charging based on how your fleet actually operates

We do not start from the number of chargers. We analyse how much energy the fleet needs to recover, when the vehicles are available and what electrical capacity each depot has.

Energy

Fleet energy demand

We analyse vehicles, daily mileage and expected consumption to determine how much energy must be recovered between services.

Energy demand per working day
Time

Shifts and charging windows

We study when vehicles return, how long they stay parked and when they need to be available again.

Actual time window available for charging
Operational sizing
Operations determine the infrastructure

We combine energy, availability, simultaneity and electrical capacity to define what each depot really needs.

Operations Energy Time Infrastructure
Result A solution sized for real operations
Infrastructure

Ratio of vehicles to chargers

A fleet does not necessarily need one charger per vehicle. We size how many units are really needed based on simultaneity and availability.

Actual number of charging points
Scalability

Available power and growth

We combine current needs with the site's electrical capacity and the fleet's expected development.

Power and room for growth
Technical result We size what the depot needs, not a standard number of chargers.
01 Required charging power
02 Number and type of chargers
03 Capacity for future expansion
Operational sizing
Operations determine the infrastructure

We combine energy, availability, simultaneity and electrical capacity to define what each depot really needs.

Operations Energy Time Infrastructure
Sizing variables Select a variable
01—04
Energy 01 / 04
Fleet energy demand

We analyse vehicles, daily mileage and expected consumption to determine how much energy must be recovered between services.

Energy demand per working day
Time 02 / 04
Shifts and charging windows

We study when vehicles return, how long they stay parked and when they need to be available again.

Actual time window available for charging
Infrastructure 03 / 04
Ratio of vehicles to chargers

A fleet does not necessarily need one charger per vehicle. We size how many units are really needed based on simultaneity and availability.

Actual number of charging points
Scalability 04 / 04
Available power and growth

We combine current needs with the site's electrical capacity and the fleet's expected development.

Power and room for growth
Technical result We size what the depot needs, not a standard number of chargers.
01 Required charging power
02 Number and type of chargers
03 Capacity for future expansion

Infrastructure ready to grow with the fleet and be replicated across several depots

We design the investment to meet the fleet's current needs and make future expansions, new depots and phased roll-outs easier.

Investment and roll-out
The infrastructure is designed for today's fleet and for the one that comes next.

The aim is not to install a fixed number of chargers, but to structure an investment that can be expanded and replicated sensibly as electrification progresses.

Start Current depot
Evolution More vehicles
Scale New depots
Assess the roll-out for my fleet
Growth architecture investment · scale · multi-site
01 First phase Current depot
02 Growth Expansion
03 Scale Multi-site

Investment based on real need

The cost depends on the vehicles, energy demand, available power, equipment, electrical work and the scope of each site. Sizing correctly avoids oversizing the first phase.

Objective Invest in what the current phase needs

Progressive growth

The infrastructure can be planned to add new vehicles and chargers as the fleet's electrification progresses.

Objective Expand without rethinking the project from scratch

Roll-out across several depots

We can define common technical criteria for different sites and then adapt the solution to the electrical and operational conditions of each location.

Objective Standardise the roll-out while keeping local adaptation

Phased implementation

When electrification does not happen all at once, the project can be structured by vehicles, depots or growth stages.

Objective Align the investment with the actual pace of electrification
Multi-site capability A common approach, adapted to each depot.
Common technical standards
Sizing by location
Coordinated growth
Investment and roll-out
Designed for today's fleet and the one that comes next

We structure an investment that can be expanded and replicated as electrification progresses.

Assess the roll-out for my fleet
01 Start Current depot
02 Growth Expansion
03 Scale Multi-site
Growth architecture Four decisions to structure the investment
01—04
First phase
Investment based on real need

The cost depends on the vehicles, energy demand, available power, equipment, electrical work and the scope of each site. Sizing correctly avoids oversizing the first phase.

Objective Invest in what the current phase needs.
Evolution
Progressive growth

The infrastructure can be planned to add new vehicles and chargers as electrification progresses.

Objective Expand without rethinking the project from scratch.
Multi-site
Roll-out across several depots

We define common technical criteria for different sites and adapt the solution to the electrical and operational conditions of each location.

Objective Standardise the roll-out while keeping local adaptation.
Implementation
Phased implementation

When electrification does not happen all at once, the project can be structured by vehicles, depots or growth stages.

Objective Align the investment with the actual pace of electrification.
Multi-site capability A common approach, adapted to the conditions of each depot.
01 Common technical standards
02 Sizing by location
03 Coordinated growth
The same strategy can be replicated without treating every depot as if it were the same.

The whole process under control: engineering, installation and certification for your fleet

We coordinate with fleet, maintenance and facilities managers to deliver the project without treating the charging infrastructure as an isolated job.

From survey to commissioning 4 phases · one single project
Analysis

Technical survey of the depot

We review the car park, electrical infrastructure, connection points, vehicles and operating conditions to understand how charging should be integrated at each site.

Technical and operational conditions defined
We review Car park · electrical installation · operations
We define Architecture · power · equipment · growth
Engineering

Engineering and sizing

We define the electrical architecture, power, number and type of charging points and growth strategy according to the fleet's real needs.

Properly sized technical solution
Execution

Installation and coordination

We coordinate our work with maintenance, operations and technical managers to integrate the work and reduce the impact on the depot's normal activity.

Execution integrated with operations
We coordinate Fleet · maintenance · operations · facilities
We close out Checks · certificates · paperwork · commissioning
Commissioning

Verification and certification

We carry out the final checks and coordinate the technical documentation, certificates and paperwork required to get the infrastructure ready for commissioning.

Installation verified and documented
End-to-end project A single point of coordination from survey to commissioning.
✓ Engineering and sizing
✓ Execution coordination
✓ Documentation and certification
From survey to commissioning 4 phases
01—04
Coordinated project Engineering, execution and certification in a single process
Analysis 01 / 04
Technical survey of the depot

We review the car park, electrical infrastructure, connection points, vehicles and operating conditions to understand how charging should be integrated at each site.

Technical and operational conditions defined
We review Car park · electrical installation · operations
Engineering 02 / 04
Engineering and sizing

We define the electrical architecture, power, number and type of charging points and growth strategy according to the fleet's real needs.

Properly sized technical solution
We define Architecture · power · equipment · growth
Execution 03 / 04
Installation and coordination

We coordinate our work with maintenance, operations and technical managers to integrate the work and reduce the impact on the depot's normal activity.

Execution integrated with operations
We coordinate Fleet · maintenance · operations · facilities
Commissioning 04 / 04
Verification and certification

We carry out the final checks and coordinate the technical documentation, certificates and paperwork required to get the infrastructure ready for commissioning.

Installation verified and documented
We close out Checks · certificates · paperwork · commissioning
End-to-end project A single point of coordination from survey to commissioning.
✓ Engineering and sizing
✓ Execution coordination
✓ Documentation and certification

Manage energy and prioritise charging according to fleet operations

Management logic Energy · operations · data
Power

Dynamic load management

We distribute the available power among the connected vehicles to make the most of the depot's electrical capacity, without treating each charger as an independent load.

Efficient use of the available capacity
Operation

Scheduling and prioritisation

Sessions can be organised according to shifts, schedules and upcoming departures, giving priority to the vehicles that need to be back in service first.

Energy available when the vehicle needs it
Platform

Management platform

Centralise chargers, sessions, consumption and users for greater control over the infrastructure and its use.

Centralised infrastructure data
Data and costs

Monitoring and cost control

Monitor activity remotely and, where the model requires it, add tools for financial management, cost allocation or billing of consumption.

Consumption, tracking and financial control
Operational charging control
Energy is allocated according to fleet operations
Active management
Scheduling By shift
Priority Next departure
Power Dynamic
Charging queue Operational priority
Vehicle 01
Departing soon Charging now
Priority High
Vehicle 02
Second departure Scheduled
Priority Medium
Vehicle 03
Later departure Waiting
Priority Scheduled
Distribution of available power Dynamic
Management capabilities Four layers of operational control
Swipe
01 Power
Dynamic load management

We distribute the available power among the connected vehicles to make the most of the depot's electrical capacity, without treating each charger as an independent load.

Efficient use of the available capacity
02 Operation
Scheduling and prioritisation

Sessions can be organised according to shifts, schedules and upcoming departures, giving priority to the vehicles that need to be back in service first.

Energy available when the vehicle needs it
03 Platform
Management platform

Centralise chargers, sessions, consumption and users for greater control over the infrastructure and its use.

Centralised infrastructure data
04 Data and costs
Monitoring and cost control

Monitor activity remotely and, where the model requires it, add tools for financial management, cost allocation or billing of consumption.

Consumption, tracking and financial control

Why trust Activacar with your fleet charging?

01 Engineering

Engineering and sizing

We analyse vehicles, energy demand, charging windows, available power and expected growth before defining the infrastructure.

A solution tailored to operations
02 End-to-end project

Full certification

We coordinate the technical documentation, certificates, checks and paperwork required to commission the installation.

Centralised technical management
03 Energy

Dynamic load management

We distribute the available power among the connected vehicles to match charging to each depot's electrical capacity and operations.

Efficient use of power
04 Operation

Management platform

We centralise chargers, sessions, consumption and users to control the infrastructure and simplify the fleet's operational management.

Centralised operational control
05 Continuity

Maintenance and SLA

Preventive and corrective maintenance and technical support, with service terms adapted to the needs of each project.

Operational continuity
06 Scalability

Multi-site coordination and roll-out

We coordinate fleet, maintenance and facilities managers and can apply common project criteria across different depots.

One or several depots
07 Experience

Proven experience

Experience in B2B mobility and charging projects allows us to propose solutions with technical and operational criteria from the outset.

Real projects

Maintenance and support for your fleet's charging points

Operational continuity backed by real experience. Activacar offers a dedicated Maintenance of Electric Chargers to inspect, diagnose and keep the charging infrastructure running, helping to ensure its continuity and evolution as the fleet's needs grow.

After commissioning continuity · support · experience
Operational continuity
The infrastructure must keep working after it is installed
01—04
Prevention

Preventive maintenance

We inspect chargers, connections, protections and components to detect possible faults before they affect the availability of the infrastructure.

Incidents

Corrective maintenance

We analyse the cause of incidents and coordinate the work needed to restore the infrastructure.

Assistance

Technical support

We provide assistance with the operation, configuration and management of the infrastructure and coordinate action when an incident arises.

Service

SLA by project

Service terms can be defined according to the criticality, scope and specific operational needs of each installation.

Service terms

The specific response times and terms of each SLA are set according to the operational needs and scope of each project.

Inspection, diagnosis and support after commissioning. See maintenance
Proven B2B experience
Real projects that demonstrate coordination and the ability to scale
PROOF
Published project
Corporate setting · Málaga

Advance Andalusia

Corporate charging project in Málaga

Survey and planning, installation of four charging points, set-up, commissioning and coordination of the work with the company's normal activity.

4 chargers Malaga Survey + installation B2B coordination
See the Avanza project
32 chargers installed
Proof of scale

McArthurGlen Designer Outlet Málaga

Larger-scale B2B project with 32 chargers and integration with the EVcharge platform to centralise management of the infrastructure.

→
Trust based on real delivery Continuity, corporate settings and technical capacity to scale.
After-sales Preventive + corrective + support
Advance Andalusia Published corporate project in Málaga
McArthurGlen Large-scale installation + EVcharge integration
After commissioning Continuity
The infrastructure must keep working after it is installed

Maintenance, support and service terms adapted to the operational needs of each project.

Operational continuity Four service layers
01—04
01
Prevention
Preventive maintenance

We inspect chargers, connections, protections and components to detect possible faults before they affect availability.

02
Incidents
Corrective maintenance

We analyse the cause of incidents and coordinate the work needed to restore the infrastructure.

03
Assistance
Technical support

We provide assistance with the operation, configuration and management of the infrastructure and coordinate action when an incident arises.

04
Service
SLA by project

Service terms can be defined according to the criticality, scope and specific operational needs of each installation.

Service terms

The specific response times and terms of each SLA are set according to the operational needs and scope of each project.

Proven B2B experience Corporate setting + capacity to scale
PROOF
Published project
Corporate setting · Málaga
Advance Andalusia
Corporate charging project in Málaga

Survey and planning, installation of four charging points, set-up, commissioning and coordination with the company's normal activity.

4 chargers Malaga Installation B2B coordination
See the Avanza project
32 chargers installed
Proof of scale
McArthurGlen Málaga

B2B installation of 32 chargers and integration with the EVcharge platform.

→
Trust based on real delivery Continuity + coordination + scale
✓
After-sales Preventive and corrective maintenance and technical support
4
Advance Andalusia Published corporate project in Málaga
32
McArthurGlen Large-scale installation + EVcharge integration

Frequently asked questions about charging points for vehicle fleets

There is no fixed ratio between the number of vehicles and the number of chargers. To size the installation, we analyse how much energy the fleet needs to recover, how many vehicles are at the depot at the same time, how long they stay parked and how the operation may grow. With that data we define the charging points that are really needed.

Not necessarily. If vehicles have different arrival and departure times, several can use the infrastructure at different times. The right ratio of vehicles to chargers depends on simultaneity, charging windows and the energy each vehicle must recover before going back into service.

We study the vehicles, daily mileage, consumption, the energy they must recover between services, the time available for charging and how many vehicles may be plugged in at the same time. We then compare that demand with the power available at the depot to define a technically viable solution.

It depends on operations. When vehicles stay parked for several hours, AC charging can cover the energy needed without high power levels. If the windows between services are short or energy demand is high, higher-power charging or fast charging may need to be considered. The decision should be based on the actual timing, consumption and availability of each vehicle.

Dynamic load management systems can distribute the available electrical capacity among the connected vehicles. This way, the chargers do not work as independent loads at full power, but as part of a coordinated infrastructure that adapts energy distribution to the depot's needs.

Yes, when the equipment and the management platform are compatible. Sessions can be organised according to schedules, shifts and upcoming departures, giving priority to the vehicles that need to be back in service first or that need to recover more energy for their next service.

We can define common technical criteria for the whole fleet, but each depot must be assessed according to its available power, electrical infrastructure, number of vehicles and operations. This way the roll-out can be standardised without treating every location as if it had the same conditions.

The cost depends on the number of vehicles, energy demand, available power, the number and type of chargers, electrical work, management systems, the number of depots and expected growth. That is why we carry out a technical survey before defining the investment, and avoid sizing the first phase solely on the total number of vehicles.

Professional installation of electric vehicle charging points
Fleet charging Infrastructure sized for real operations

We analyse vehicles, energy, shifts, available power and growth to define a solution ready for one or several depots.

Questions about fleet charging 8 questions

Frequently asked questions about charging points for vehicle fleets

Answer

There is no fixed ratio between vehicles and chargers. We analyse the energy needed, simultaneity, time available at the depot and expected growth to define how many points the operation really needs.

Answer

Not necessarily. When vehicles have different arrival and departure times, several can use the infrastructure at different times without needing one charger per vehicle.

Answer

We study vehicles, mileage, consumption, energy to be recovered, charging windows and simultaneity. We then compare that demand with the power available at the depot to size the installation.

Answer

It depends on operations. If vehicles stay at the depot for several hours, AC charging may be enough. With very short windows or high energy demand, higher power or fast charging may need to be considered.

Answer

Dynamic load management can distribute the available capacity among the connected vehicles, adapting energy distribution to the depot's needs and avoiding treating each charger as an independent load.

Answer

Yes, when the equipment and the platform are compatible. Charging can be organised according to shifts, schedules and upcoming departures to prioritise the vehicles that need to be back in service first.

Answer

We can define common technical criteria for the whole fleet, but each depot is sized according to its power, electrical infrastructure, vehicles and operations. This standardises the roll-out without treating every location as if it were the same.

Answer

The cost depends on vehicles, energy demand, available power, chargers, electrical work, management systems, number of depots and expected growth. That is why we carry out a technical survey before defining the investment.

Cities where we install charging points for electric vehicle fleets

Our partners and the companies that place their trust in us

Request a survey to install your fleet's charging points with Activacar

Tell us how your fleet works and the charging needs you want to cover. We will analyse the number of vehicles, their routes and schedules, the time available for charging and the energy needs of the operation.

With this information we can propose a solution tailored to your activity, whether you are just starting to electrify your fleet or need infrastructure ready to add new vehicles and charging points.

Leave your details in the form and our team will review the project to help you define the most suitable charging solution for your fleet.

Tell us how your fleet works and what charging needs you have. We will analyse vehicles, schedules, charging times and energy demand to define a solution tailored to your operation.