EV charging point installation for new-build developments


We design and implement charging infrastructure from the design phase, coordinated with the electrical installation, the garage and the construction work. We size the solution for the development's handover needs and its future growth.

 We design and certify the charging infrastructure from the design phase

Integrating the charging infrastructure during the design phase allows it to be coordinated with the development's electrical design and car park.

Engineering

Project sizing

We analyse the parking spaces, their layout, expected demand and growth needs to define the scope of the infrastructure from the design phase.

Scope and growth forecast
Electrical design

Electrical infrastructure

We study the planned power, conduits, panels, protections and electrical routes to integrate charging with the development's overall design.

Integration with the overall project
From design to commissioning
Engineering, technical compliance and certification in a single solution
Technical compliance

Applicable regulations

We integrate the technical requirements applicable to the project, including Spanish building code CTE DB-HE 6 and ITC-BT-52, so the infrastructure is properly planned from the design stage.

CTE DB-HE 6 · ITC-BT-52
Commissioning

Full documentation and certification

We coordinate the certificates, technical documentation and paperwork required to get the infrastructure ready for commissioning.

Documentation · certificates · paperwork
Technical review of the development

We can review plans, the car park and the electrical infrastructure to define how to integrate charging before construction progresses.

Request a technical survey
Technical project
From engineering to certification
4 areas
Design → commissioning Engineering + compliance + certification
Engineering 01 / 04
Project sizing

We analyse the spaces, their layout, expected demand and growth needs to define the scope of the infrastructure from the design phase.

Scope and growth forecast
Electrical design 02 / 04
Electrical infrastructure

We study power, conduits, panels, protections and electrical routes to integrate charging with the development's overall design.

Integration with the overall project
Technical compliance 03 / 04
Applicable regulations

We integrate the technical requirements applicable to the project, including CTE DB-HE 6 and ITC-BT-52, to plan the infrastructure properly from the design stage.

CTE DB-HE 6 · ITC-BT-52
Commissioning 04 / 04
Full documentation and certification

We coordinate the certificates, technical documentation and paperwork required to get the infrastructure ready for commissioning.

Documentation · certificates · paperwork
Technical review

We review plans, the car park and the electrical infrastructure to define how to integrate charging before construction progresses.

Request a technical survey

We design the right charging infrastructure for each property development

Power, user and consumption management when the project requires it.

Dynamic load management

We distribute the available energy among different charging points to optimise the installation and adapt its operation to the property's actual demand.

Management platform

When the project requires it, the infrastructure can include tools to monitor chargers, sessions and consumption centrally.

User control

We define access and usage levels according to the planned operating model, making it easier to manage charging in an orderly way for residents, users or authorised profiles.

Charging billing

The infrastructure can include billing features when the project needs to pass on consumption costs or set up a usage system with financial control.

Operational management
Infrastructure control
4 functions
Power 01 / 04
Dynamic load management

We distribute the available energy among different charging points to optimise the installation and adapt its operation to the property's actual demand.

Smart distribution of available energy
Platform 02 / 04
Management platform

When the project requires it, the infrastructure can include tools to monitor chargers, sessions and consumption centrally.

Centralised charging monitoring
Access 03 / 04
User control

We define access and usage levels according to the operating model, making orderly management easier for residents, users or authorised profiles.

Access adapted to the property's model
Consumption 04 / 04
Charging billing

The infrastructure can include billing features when the project needs to pass on consumption costs or set up a usage system with financial control.

Financial management when the project requires it

How we install charging points in a new-build development 

Coordination within the construction work
Site management Engineering Building services Main contractor Project management
Starting point Phase 01

Technical review

We review plans, the electrical design, the car park and the development's needs to identify how our work should fit in with the rest of the construction.

Project and constraints identified
Phase 02 Integration into the project

Design and coordination

We define the solution together with the engineering, building services and site management teams to coordinate scope, scheduling and possible interference with other work.

Solution integrated with the rest of the construction
During construction Phase 03

Execution

We build the infrastructure according to the project schedule and coordinate our work with the overall progress of construction.

Execution coordinated with the construction schedule
Phase 04 Project close-out

Verification and handover

We carry out the final checks, coordinate the relevant documentation and certification and leave the infrastructure ready for commissioning.

Infrastructure ready for handover

A single point of contact to coordinate the charging infrastructure with the teams already working on the development.

Site coordination
From design to handover
4 phases
Site management Engineering Building services Main contractor Project management
Starting point 01 / 04
Technical review

We review plans, the electrical design, the car park and the development's needs to identify how our work should fit in with the rest of the construction.

Project and constraints identified
Integration into the project 02 / 04
Design and coordination

We define the solution together with the engineering, building services and site management teams to coordinate scope, scheduling and interference with other work.

Solution integrated with the construction
During construction 03 / 04
Execution

We build the infrastructure according to the project schedule and coordinate our work with the overall progress of construction.

Execution aligned with the schedule
Project close-out 04 / 04
Verification and handover

We carry out the final checks, coordinate the relevant documentation and certification and leave the infrastructure ready for commissioning.

Infrastructure ready for handover

Why trust Activacar to install the charging points in your property development?

01 Engineering

Engineering and sizing

We analyse the project, the spaces, the electrical infrastructure and expected needs to size the solution during the construction phase.

A project tailored to the development
02 End-to-end project

Full certification

We coordinate the technical documentation, certificates and paperwork required to commission the infrastructure properly.

Centralised technical management
03 Energy

Dynamic load management

We distribute the available power among the charging points to match their operation to the property's electrical capacity.

Efficient use of power
04 Operation

Management and billing platform

Control of chargers, users, sessions, consumption and billing options from a centralised management environment.

Infrastructure control
05 Continuity

Maintenance and SLA

Preventive and corrective maintenance and technical support, with service terms adapted to the needs of each project.

Operational continuity
06 Scalability

Coordination and roll-out across several developments

We can apply common technical criteria across different developments, then adapt each infrastructure to the characteristics of each project.

One or several projects
07 Experience

Proven experience

Experience in real projects allows us to integrate technical, operational and maintenance criteria from the earliest stages of the project.

Experience in real projects

Turn EV charging into added value for your property development

Integrating the charging infrastructure from the design phase does not just prepare the development for current needs. It also improves the experience of future owners, reduces later work in the garage and allows the installation to evolve as electric mobility grows.

A development ready for electric mobility

Integrating the charging infrastructure from the design stage allows you to hand over a building ready for the current and future needs of electric vehicles.

Greater convenience for owners and residents

Future users have infrastructure ready to add charging to their spaces without having to plan each installation from scratch.

Less work in communal areas later on

Planning routes, conduits and communal elements during construction reduces the need for new work in the garage every time a request comes in.

Infrastructure that keeps pace with the growing number of electric vehicles

A scalable solution allows new charging points to be added as demand grows, making use of the main infrastructure already planned in the development.

An additional selling point for the development

Having charging infrastructure planned from the design stage allows electric mobility to be presented as an additional feature of the development to future buyers or residents.

5 benefits
Electric mobility from the design stage
A development ready for the needs of its future owners

Integrating the infrastructure during construction allows you to hand over a garage that is ready to grow, without turning every new charging point into a separate job.

Combined value Five layers of value for the development
01—05
Project 01 / 05
A development ready for electric mobility

Integrating the charging infrastructure from the design stage allows you to hand over a building ready for the current and future needs of electric vehicles.

Residents 02 / 05
Greater convenience for owners and residents

Future users have infrastructure ready to add charging to their spaces without having to plan each installation from scratch.

Communal areas 03 / 05
Less work in communal areas later on

Planning routes, conduits and communal elements during construction reduces the need for new work in the garage every time a request comes in.

Scalability 04 / 05
Infrastructure that keeps pace with the evolution of electric vehicles

A scalable solution allows new charging points to be added as demand grows, making use of the main infrastructure already planned in the development.

Commercial value 05 / 05
An additional selling point for the development

Having infrastructure planned from the design stage allows electric mobility to be presented as an additional feature to future buyers or residents.

Maintenance and support after handover of the development

A development's charging infrastructure must keep working properly after the building is handed over. Preventive maintenance, a fast response to incidents and the ability to expand the installation are key for the system to meet the needs of owners and residents over time.

Activacar offers a dedicated Maintenance of Electric Chargers to inspect, diagnose and keep charging installations running, as well as supporting future expansions as demand grows.

After commissioning Continuity + experience
The infrastructure must keep working

Maintenance is adapted to the scope of the installation and the operational needs of each development.

01

Preventive maintenance

Regular inspections of the infrastructure to detect possible faults before they affect the installation's operation.

02

Corrective maintenance

Incident diagnosis and coordination of the work needed to restore the infrastructure.

03

Technical support

Technical support to answer questions, review operation and coordinate needs related to the installation.

04

SLA by project

Service terms can be defined according to the criticality, scope and specific operational needs of each project.

The specific response times and terms of each SLA are set according to the project's needs.

See maintenance →
Preventive + corrective
SLA by project
Experience in real projects
End-to-end project capability 8 B2B pillars
Engineering Legalisation Load management Platform and billing Mantainance Coordination Multi-project roll-out Real experience
Ongoing support
Infrastructure ready to keep growing

The project can be handed over today, but the infrastructure must be ready to keep working and evolving as new owners add electric vehicles.

After handover Infrastructure continuity cycle
01—04
↻ Service Ongoing support
Prevention 01 / 04

Preventive maintenance of the infrastructure

We carry out regular inspections of chargers, panels, protections, connections and other installation components to detect possible problems before they cause an incident.

✓ Regular inspection
Incidents 02 / 04

Incident diagnosis and resolution

When a fault appears, we analyse its cause and coordinate the work needed to restore the installation and prevent the problem from affecting the rest of the infrastructure.

✓ Diagnosis and action
Expansion 03 / 04

Support for new expansions

If new owners request charging points, we study how to add them using the existing infrastructure while keeping the electrical installation properly organised.

✓ New charging points
Evolution 04 / 04

The installation evolves as demand grows

As the number of electric vehicles grows, we can review the power, load management and capacity of the infrastructure to adapt the system to the development's new needs.

✓ Scalable infrastructure

Cities where we install charging points in property developments

Frequently asked questions about charging points in new-build developments

The development should plan the infrastructure needed for charging to be properly integrated into the car park: cable conduit systems, routes, spaces and the electrical elements required by the project scope. All of this must be coordinated with the building's general electrical installation and planned in line with CTE DB-HE 6 and ITC-BT-52.

No. New-build private residential buildings must include cable conduit systems that allow a future supply to charging stations for 100% of the parking spaces. This does not mean it is mandatory to hand over a charger installed individually in each space.

The power forecast is studied within the electrical design, taking into account the number of spaces, the installation layout, the power planned for charging, the estimated demand and the applicable simultaneity factors. We also assess whether it makes sense to add dynamic load management to make better use of the available capacity.

The installation can include dynamic management systems that distribute the available energy among the different charging points. This way several simultaneous sessions can be coordinated and the power delivered to each vehicle adapted, without using the full maximum power of every charger at the same time.

Yes. Activacar can coordinate the technical documentation, certificates, inspections and paperwork required for the certification and commissioning of the infrastructure, adapting the process to the characteristics and specific scope of each development.

Yes. If the infrastructure is designed from the start with future expansion in mind, new charging points can be added as demand grows. The aim is to make use of the conduits and communal elements already planned, avoiding the need to completely rethink the garage installation.

There is no single price. The investment depends on the number of spaces, the car park layout, distances, conduits, the available electrical infrastructure and the scope to be carried out during construction. That is why the plans and characteristics of the development need to be reviewed before a financial proposal is defined.

It is best to define the infrastructure during the design phase, before the main building services and car park finishes are installed. That way it can be coordinated with engineering, site management and the other building services, reducing later changes during construction.

Professional installation of an electric vehicle charging point
Infrastructure prepared during construction

We design the solution taking into account the garage, the electrical installation and how future residents' charging demand may evolve.

FAQ · New build

Frequently asked questions about charging points in new-build developments

Professional installation of an electric vehicle charging point
Infrastructure prepared during construction

We design the solution taking into account the garage, the electrical installation and how future residents' charging demand may evolve.

Select the topic you want to see 8 questions
Regulations and scope 2 questions
Infrastructure 01 / 08

The development should plan the infrastructure needed for charging to be properly integrated into the car park: cable conduit systems, routes, spaces and the electrical elements required by the project scope. All of this must be coordinated with the building's general electrical installation and planned in line with CTE DB-HE 6 and ITC-BT-52.

Regulations 02 / 08

No. New-build private residential buildings must include cable conduit systems that allow a future supply to charging stations for 100% of the parking spaces. This does not mean it is mandatory to hand over a charger installed individually in each space.

Design and management 3 questions
Power 03 / 08

The power forecast is studied within the electrical design, taking into account the number of spaces, the installation layout, the power planned for charging, the estimated demand and the applicable simultaneity factors. We also assess whether it makes sense to add dynamic load management to make better use of the available capacity.

Energy management 04 / 08

The installation can include dynamic management systems that distribute the available energy among the different charging points. This way several simultaneous sessions can be coordinated and the power delivered to each vehicle adapted, without using the full maximum power of every charger at the same time.

Legalisation 05 / 08

Yes. Activacar can coordinate the technical documentation, certificates, inspections and paperwork required for the certification and commissioning of the infrastructure, adapting the process to the characteristics and specific scope of each development.

Development and investment 3 questions
Scalability 06 / 08

Yes. If the infrastructure is designed from the start with future expansion in mind, new charging points can be added as demand grows. The aim is to make use of the conduits and communal elements already planned, avoiding the need to completely rethink the garage installation.

Investment 07 / 08

There is no single price. The investment depends on the number of spaces, the car park layout, distances, conduits, the available electrical infrastructure and the scope to be carried out during construction. That is why the plans and characteristics of the development need to be reviewed before a financial proposal is defined.

Planning 08 / 08

It is best to define the infrastructure during the design phase, before the main building services and car park finishes are installed. That way it can be coordinated with engineering, site management and the other building services, reducing later changes during construction.

Our partners and the companies that place their trust in us

Request a survey to install charging points in your property development

Tell us about your development and the charging needs you want to cover. We will analyse the number of spaces, the planned power, the electrical infrastructure and the project's growth potential.

With this information we can propose a solution tailored to the development, whether you need a pre-installation ready for future connections or want to hand over charging points installed from the start.

Leave your details in the form and our team will review the project to help you define the most suitable charging solution for your new-build development.

Tell us about your development and the charging needs you want to cover.
We will analyse the number of spaces, the planned power and the electrical infrastructure to define the most suitable solution.

We can offer either a pre-installation ready for future connections or the installation of charging points from the start in your new-build development.

Leave your details and we will review your project.